    3333=== Progress so far:
    3434||
    35 The evaluation run for Berlin (winter IOP VALM01) is currently executing on the new HLRN-system in Berlin. The setup for the summer IOP (VALM02) is prepared and tested.
     35Validation run VALM01:
     36  - Simulation is finished and results are post-processed and available
     37
     38Validation run VALM02:
     39  - Simulation is finished
     40  - Simulation output is being post-processed
     41
     42Validation run VALM04:
     43  - Preparation of simulation started
     44  - Details of simulation setup are being discussed together with members of 3DO+M
     45
     46See also [/wiki/palm4u/status the Status Quo page] for an up-to-date list of progress for each validation simulation.
    3647||
    3748=== References:
                                                                                                                                                                                                                                                                                                                                                                               