102 | | ||Nested simulation ||30/11/2020 || || Error in photolysis scheme: Module B detected that there is only a simple scheme available without accounting for shadowing. Simulation is on hold until discussed if higher order scheme can be used instead. || |
103 | | ||Nested simulation ||02/12/2020 || || Building setup needs further update: air conditioning for office buildings constructed before 2000 must be turned off to give more realistic waste-heat fluxes in Berlin. || |
| 102 | ||Nested simulation ||30/11/2020 || 07/12/2020 || Error in photolysis scheme: Module B detected that there is only a simple scheme available without accounting for shadowing. Due to extensive re-coding required to account for this, the simulation is continued without 3d photolysis || |
| 103 | ||Nested simulation ||02/12/2020 || 07/12/2020 || Building setup needs further update: air conditioning for office buildings constructed before 2000 must be turned off to give more realistic waste-heat fluxes in Berlin. Building parameters were updated accordingly. || |
| 104 | ||Nested simulation ||11/12/2020 || - || Simulation reached 04:05 UTC (1st day) || |